Participants, health, scedule

 Location:

We will be filming at my house and the various rooms inside it and the approaching road along the treeline 







Schedule:

(1/20/24)(1/21/24) - We will begin filming. I will film all of the main action and wide shots without dialogue first, which occur in scenes 1 - 8. I will also film all of the insert and montage shots which occur in scenes 3, 4, 5. I will film the ending scene last with the sound tech in the room.

(1/27/24)(1/28/24) - We will finish filming all the necessary shots for each scene. All monster scenes will be filmed. We will film every shot with dialogue which occurs in scenes 1 and 2. I will record the voice overs which occur in scene 1, and record all of the monster sounds and audio.

(2/3/24)(2/4/24) - Editing will take place. All of the shots and footage will be individually edited before they are all simultaneously uploaded uploaded to CapCut where all of the main editing process will occur The audio that has been recorded will also be edited on CapCut in a separate file before it is added to the actual footage itself. Participants:

Actors:

  • Kevin Lopez - Kevin
  • Lance Reyes - Lance/Monster

Filming:

• Lance Reyes

Editing:

• Lance Roper

Directing:

• Lance Reyes

Health and Safety:

To ensure the safety of both my partner and I, my parents will be present as filming and costume/set design is taking place. They will provide supervision, and be on standby in the case of any accidents or injuries that may take place. They will have 911 on speed dial and a first aid kit will be easily accessible.

In the scenes where the monster must be standing on an elevated surface there will be multiple mats and members of the safety crew will be present to ensure an accidental fall does not occur.

Comments

Popular posts from this blog

Final editing